News Flash Home
The original item was published from 8/13/2015 2:49:00 PM to 8/13/2015 3:40:43 PM.

News Flash

Engineering

Posted on: August 7, 2015

[ARCHIVED] 9th/10th Avenue North Sealcoat Improvements

Roadblock3.jpg

Please be advised that on Saturday, August 15, 2015, the sealcoat project will commence on 9th/10th Avenue North from Sauk Rapids Regional Bridge to 4th Street South. This work will require that lanes be intermittently closed and that traffic be reduced to one lane in each direction. Flagging operations will be used that will further reduce traffic to one lane for both directions. Additionally, non-signalized intersecting side streets will be temporarily closed. Signalized intersection(s) will be intermittently closed for short durations when sealcoat operations are being performed in respective intersection(s).

Through traffic will be maintained, but motorists can expect minor traffic delays and are advised to find an alternate route if possible.

It is anticipated that this sealcoat project will be completed by the end of the day, weather permitting.

Facebook Twitter Email

Other News in Engineering

Road Closed Sign

Road Closure - 8th Avenue S

Posted on: September 29, 2023
Road Closed Sign

Road Closures - SCSU 5K

Posted on: September 29, 2023
Road Closed Sign

Road Closure - 5th Avenue S

Posted on: September 27, 2023
Road Closed Sign

Partial Closure of the Beaver Island Trail

Posted on: September 7, 2023
Road Closed Sign

Road Closure- Wilson Ave

Posted on: May 30, 2023
Road Closed Sign

Highway 10/23 Road Work

Posted on: April 11, 2023