Construction Site Information

Post Construction Stormwater Requirements

The City's requirements for post construction stormwater management have been updated and are effective March 11, 2015.  Major Changes Include:
  • 1" Volume Reduction For New Development
  • Maintenance Agreement Requirement
  • Easement Requirement
Use the Post Construction Stormwater Standards Guide and additional materials below to meet the requirements. Please reference Article 19.12 of the Land Development Code and associated appendices for specific language.
Post Construction Stormwater Guidance Flow Chart

Land Disturbance Permit Information

The City of St. Cloud enforces an ordinance related to erosion and sediment control during land disturbing activities. all land disturbance activities must comply with the ordinance, however, only the following are required to obtain a Land Disturbance Permit (LDP):
  • All new single family home lots
  • Land disturbing activities that disturb greater than or equal to 5,000 square feet.
The Stormwater System Use Code (PDF) contains land disturbance, erosion and sediment control requirement beginning in Section 365:40.
 

Residential Information


Utilities & Excavator Information


Regulatory & Education Materials